Final Acceptance Test

The project is done when a coordinator can run a documented test that:

  1. Boots the D3-TUI Dreamcast executable through the RG/KNULLI Dreamcast path.
  2. Shows the D2-inspired kinetic logo, snow/background, input field, and angled/fading dialogue queue.
  3. Injects or types a command from the handheld.
  4. Sends it over the selected telemetry bridge to relik-pi4.
  5. Dispatches Hermes work without blocking the frontend.
  6. Displays the Hermes response on the frontend.
  7. Survives frontend disconnect while backend work continues.
  8. Runs 50 consecutive request/response cycles with measured latency and no message corruption.
  9. Commits a proof video and logs to this repo.