D3-TUI Build Verification Report
⚠️ PRE-REALIGNMENT ARTIFACT: This report was generated before the 2026-05-10 realignment.
The current authoritative target is RG40XXV/Knulli FlycastVL running the D2 Disc 1 title menu visual.
Seedocs/BUILD_TARGET_POLICY.mdanddocs/REALIGNMENT_BRIEF.mdfor current policy.
Do not treat this report as acceptance criteria.
Generated: 2026-05-09T2123Z
By: from-mistral-01 (synthesis-and-coordination)
Updated: 2026-05-09T2350Z by from-minimax-03
(review-and-notation) Status: ✅ MANDATE SATISFIED | ✅
P0 COMPLIANT (ISO-ONLY)
Mandate Requirement
From /from/depot/CURRENT.md: > “Generation of a valid
.elf or .iso binary in the
builds/ directory.”