Flag 8 (current state): Lots of tangible surfaces,
assets at play. Partner (Mike) is in-flight but needs more structure.
Overarching structure hasn’t been fully introduced. Needs fleshing out,
design, ratification into consolidated operational tools + protocols.
Probably a roadmap too. All requires a zoom-in session.
Disambiguation Flags
What’s the current state — mockups exist? half-built? not
started? → Tangible surfaces exist, Mike is active, but
overarching structure missing. Needs zoom-in.